Identify applicable sections
Work from assigned CSI sections and related requirements instead of relying on a generic contractor log.
SubmittalsHQ helps trade partners isolate relevant requirements and review them against the specification before procurement and submittal planning begin.
Work from assigned CSI sections and related requirements instead of relying on a generic contractor log.
Separate the item description from its type and retain the source language behind it.
Flag unclear responsibility, cross-references, and requirements that may affect suppliers or fabrication.
Trade partners can review their own scope early, compare it with the general contractor’s register, and raise omissions or responsibility questions while there is still time to act.
The contractor’s register is a coordination tool, not a substitute for reading the subcontract documents. A scope-focused review helps you identify requirements tied to your suppliers, fabricators, installers, testing providers, and delegated-design professionals.
Retaining the page and paragraph makes it easier to discuss a questioned item with the contractor and to pass the correct requirement to the party preparing it.
If a requirement is missing, provide the section and paragraph when raising it. If a row appears outside your scope, identify the supporting language and the contractual basis for your question. Source-based discussions are clearer than disagreements over a spreadsheet label.
Suppliers and detailers work more effectively when they receive specific deliverables and supporting paragraphs rather than an entire project manual with a generic request to “provide all submittals.”
Not by itself. The subcontract, scope exhibits, drawings, addenda, and other incorporated documents control. Specification requirements are essential evidence, but responsibility must be confirmed contractually.
Yes. A focused register can support internal planning and comparison with the GC’s project-wide log. Include related and cross-referenced sections where they affect your work.
Separate entries when different suppliers, timing, or review paths make that useful. Combine related items when they will form one coordinated package.
A controls subcontractor receives Division 23 specifications containing product data, control diagrams, points lists, sequences, qualifications, demonstration requirements, and closeout records. Some requirements sit in the controls section; others are cross-referenced from equipment sections or commissioning requirements.
A scope-focused register identifies each deliverable and retains the source. The subcontractor can separate supplier literature from project-specific shop drawings, flag information needed from the mechanical and electrical trades, identify any delegated-design responsibility, and plan training and closeout requirements before the end of the project.
When the GC register arrives, the subcontractor compares lists. Missing requirements can be raised with paragraph references. Items assigned incorrectly can be discussed against the subcontract and source rather than accepted or rejected based on a generic row title.