SubmittalsHQ learning center

Practical guidance for building a better submittal register.

Learn how to find requirements in construction specifications, turn them into usable register entries, and connect the resulting list to project responsibility and schedule.

Start with the register

Understand the working record before building it.

Guide 01

How to create a submittal register

A step-by-step workflow for confirming the document set, reviewing sections, writing useful actions, resolving grouping, and adding dates.

Resource

Free Excel register template

A downloadable workbook with source, responsibility, review, schedule, and status fields plus realistic examples.

Review the project manual

Find requirements without reducing the specifications to keywords.

Product

Specification review software

How SubmittalsHQ reconstructs hierarchy, identifies candidate requirements, retains evidence, and presents exceptions for review.

Connect requirements to the work

The register is useful because of what happens next.

Finding a requirement is only the beginning. The project team must decide whether it belongs, write a specific title, classify the deliverable, confirm responsibility, determine packaging, and establish timing that supports procurement and installation.

Our construction submittal process guide follows those requirements through preparation, contractor coordination, design-team review, resubmission, and the approved project record.

A recommended reading order

New to register creation? Start with the construction submittal register guide, continue with the creation workflow, then read the specification-search and Division 01 guides. Use the process guide to connect the register to downstream project control.

The core ideas behind every guide

01

Keep the evidence

Record the section, page, paragraph, and source language so another person can validate the interpretation.

02

Separate type from subject

“Shop Drawing” is a classification. “Power, signal, and control wiring diagrams” is a usable action title.

03

Make judgment visible

Duplicates, implied actions, grouping, scope, and responsibility should be resolved deliberately rather than hidden by automation.

For general contractors

Use the guides to establish a documented method for creating the first register, reviewing consultant-authored sections consistently, and handing a more understandable list to the operations team. Pair the technical review with procurement, buyout, drawings, addenda, and owner requirements.

For subcontractors

Use the same method on the specification sections tied to your scope. Compare the resulting list with the contractor’s register, identify supplier and delegated-design responsibilities, and raise questions using the actual source reference.

What specification review cannot decide alone

The specifications are only part of the contract documents. A specification-derived register does not independently establish subcontract scope, guarantee completeness, replace drawing review, or determine schedule dates without project milestones and procurement information.

That limitation is not a reason to accept a weak register. It is a reason to make the specification portion traceable and explicit, then complete the project record with the other governing information.

Choose the right guide

Start with the question in front of you.

If you need to…Read this next
Understand register fundamentalsConstruction submittal register guide explains fields, types, sources, grouping, schedules, and quality checks.
Build a register manuallyHow to create a submittal register provides the complete working sequence and examples.
Find requirements in a sectionHow to find submittals in specifications covers Parts 1–3, hierarchy, keywords, and edge cases.
Interpret administrative proceduresDivision 01 submittal requirements separates project rules from technical rows.
Understand what happens downstreamConstruction submittal process follows preparation, coordination, review, revision, and record control.
Begin with a workbookThe free Excel template provides practical columns, examples, validation lists, and instructions.

Learning center questions

Are these guides only about using SubmittalsHQ?

No. They document practical register and specification-review methods that can be used manually. Product pages explain where SubmittalsHQ automates or supports parts of that work.

Do the guides replace project-specific contract review?

No. Every project’s contracts, drawings, specifications, addenda, scopes, schedule, and procedures control. The guides provide a structured method and examples.

Will more construction specification topics be added?

Yes. The launch cluster focuses on the strongest product fit: specification processing, register creation, Division 01, and the early submittal process. Additional articles should extend those topics only when we can add useful practitioner-level guidance.

Apply the guidance

See how SubmittalsHQ builds the first draft.

Get access